The spare capacity available to treat additional loads at the treatment plants changes regularly based upon the loads received from new and existing customers. This register is only an indication of available capacity based on available information at the date of issue and is subject to change.

This register cannot be taken as confirmation that capacity is available for a particular development. In all instances if you are considering progressing a development you should contact our Connection and Developer Services team who  will provide an up-to-date view, and greater level of detail, in relation to the availability of capacity.

This register provides wastewater treatment capacity information only and does not provide an indication of network capacity. In cases where a new development is planned, we may need to make upgrades to the wastewater network to support the collection of the new load and to mitigate the risk of flooding from occurring to our existing infrastructure. We assess whether the wastewater network can support a new development  during the connections process.

Learn more about the Pre Connection Enquiry and Connection Application process in the Connections section of this site.

At all times an executed Connection Agreement with Uisce Éireann is required to ensure a connection can be made and capacity is available for your development. All new Connections are subject to UÉ’s Connections Charging Policy and at all times the issue of a connection offer is a matter for the discretion of UÉ.

Published
RegionCountySettlementWastewater Treatment Plant (WWTP)Reg #Indication of Available CapacityWWTP Project Planned/Underway
EMLaoisPortlaoisePortlaoise WWTPD0001• GreenYes
EMLaoisPortarlingtonPortarlington WWTPD0158• Green 
EMLaoisMountmellickMountmellick WWTPD0152• Amber 
EMLaoisMountrathMountrath WWTPD0153• Green 
EMLaoisAbbeyleixAbbeyleix WWTPD0156• Green 
EMLaoisStradballyStradbally (Laois) WWTPD0292• Green 
EMLaoisRathdowneyRathdowney WWTPD0288• Green 
EMLaoisBallylinanBallylinan WWTPD0291• Green 
EMLaoisDurrowDurrow WWTPD0289• Green 
EMLaoisClonasleeClonaslee WWTPD0386• Amber 
EMLaoisBallyroanBallyroan WWTPD0385• GreenYes
EMLaoisBorris-in-OssoryBorris‐in‐Ossory WWTPD0290• RedYes
EMLaoisBallinakillBallinakill WWTPD0384• Red 
EMLaoisCastletownCastletown (Laois) WWTPD0387• Green 
EMLaoisArlessArless WWTPA0151• Amber 
EMLaoisBallacollaBallacolla WWTPA0149• Green 
EMLaoisBallybrittasBallybrittas WWTPA0139• Green 
EMLaoisCamrossCamross WWTPA0154• Green 
EMLaoisCapalugCapalug WWTPA0146• Green 
EMLaoisCloughClough WWTPA0148• Green 
EMLaoisCoolanaghCoolanagh WWTPA0136• Green 
EMLaoisCoolrainCoolrain WWTPA0132• Green 
EMLaoisEmoEmo WWTPA0150• Green 
EMLaoisErrillErrill WWTPA0144• Green 
EMLaoisKileenKileen WWTPA0153• Green 
EMLaoisNewtown DoonaneNewtown Doonane WWTPA0131• Green 
EMLaoisRosenallisRosenallis WWTPA0123• Green 
EMLaoisSwanSwan WWTPA0143• Red 
EMLaoisTimahoeTimahoe WWTPA0122• Red 

Indication of Available Capacity

This register provides an indication of available wastewater treatment capacity based on loads received in 2022 and available treatment plan capacity now or by completion of a project at construction (where relevant).

• Green = spare capacity available.

• Amber = potential spare capacity, additional analysis of applications may be required on an individual basis considering their specific load requirements. Potential availability of capacity in this case would be dependent on any additional load not resulting in a significant breach of the combined approach as set out in Regulation 43 of the Waste Water Discharge (Authorisation) Regulations 2007, which is a matter for the relevant Planning Authorities to determine

• Red = no spare capacity available at present.

WWTP Project Planned/Underway

Project planned or underway to increase capacity and/or improve treatment performance, based on available information in December 2024.

General notes

• The information in this register has been determined based on a standardised national review of the available information and is subject to change. It is indicative only, non-binding and should not be relied upon.
• This register provides commentary on the available capacity at the WWTP, it does not consider the capacity of the sewer network.
• A Pre-Connection Enquiry should be submitted to Uisce Éireann (UÉ) to determine the feasibility of connecting any particular site to the UÉ network, feasibility should not be inferred from this register. Note that a positive response to a Pre-Connection enquiry does not guarantee that a connection can be facilitated in future – an executed Connection Agreement with UÉ is required to ensure a connection can be made and capacity is available for your development. All new Connections are subject to UÉ’s Connections Charging Policy and at all times the issue of a connection offer is a matter for the discretion of UÉ. 
• Should there be a material change to the indication of available capacity during the course of the year, this will generally be updated in the web version of the register and the relevant Local Authority will be notified. 