Skip to main content

Cavan

Settlements with Waste Water Discharge Authorisations ‐ Wastewater Treatment Capacity Register

Published
Region County Settlement Census pop. (2016) Wastewater Treatment Plant (WWTP) Reg # Indication of Available Capacity WWTP Project Planned/Underway
NW Cavan Cavan 10,914 Cavan WWTP D0020 • Green  
NW Cavan Bailieborough 2,683 Bailieborough WWTP D0085 • Red Yes
NW Cavan Ballyjamesduff 2,661 Ballyjamesduff WWTP D0256 • Red Yes
NW Cavan Virginia 2,648 Virginia WWTP D0255 • Amber Yes
NW Cavan Kingscourt 2,499 Kingscourt WWTP D0083 • Red Yes
NW Cavan Cootehill 1,853 Cootehill WWTP D0082 • Green Yes
NW Cavan Belturbet 1,369 Belturbet WWTP D0084 • Green  
NW Cavan Mullagh 1,348 Mullagh WWTP D0252 • Amber Yes
NW Cavan Ballyconnell 1,105 Ballyconnell WWTP D0253 • Amber Yes
NW Cavan Ballinagh 936 Ballinagh WWTP D0501 • Amber  
NW Cavan Ballyhaise 711 Ballyhaise WWTP D0496 • Amber  
NW Cavan Shercock 588 Shercock WWTP D0495 • Green  
NW Cavan Arva 411 Arvagh WWTP D0497 • Amber  
NW Cavan Kilnaleck 393 Kilnaleck WWTP D0500 • Amber  
NW Cavan Killeshandra 388 Killeshandra WWTP D0499 • Green  
NW Cavan Blacklion 194 Blacklion WWTP D0498 • Amber  
NW Cavan Bawnboy Unavailable Bawnboy WWTP A0297 • Green  
NW Cavan Butlersbridge 276 Butlersbridge WWTP A0296 • Green  
NW Cavan Crosskeys Unavailable Crosskeys WWTP A0298 • Green  
NW Cavan Dowra Unavailable Dowra WWTP A0299 • Green  
NW Cavan Gowna 149 Gowna WWTP A0300 • Green  
NW Cavan Kilcogy Unavailable Kilcogy WWTP A0536 • Green  
NW Cavan Mountnugent Unavailable Mountnugent WWTP A0301 • Green  
NW Cavan Redhills Unavailable Redhills WWTP A0302 • Green  
NW Cavan Stradone Unavailable Stradone WWTP A0304 • Green  
NW Cavan Swanlinbar 207 Swanlinbar WWTP A0303 • Green  

Indication of Available Capacity

This register provides an indication of available wastewater treatment capacity based on loads received in 2022 and available treatment plan capacity now or by completion of a project at construction (where relevant).

• Green = spare capacity available.

• Amber = potential spare capacity, applications to be considered on an individual basis considering their specific load requirements.

• Red = no spare capacity available at present.

WWTP Project Planned/Underway

Project planned or underway to increase capacity and/ or improve treatment performance, based on available information in June 2023.

General notes

  • The indication of available treatment capacity has been determined based on a standardised national review of the available information.
  • The information in this register is subject to change.
  • This register provides commentary on the available capacity at the WWTP, it does not consider the capacity of the sewer network.
  • A Pre-Connection Enquiry should be submitted to Uisce Éireann to determine the feasibility of connecting any particular site to the Uisce Eireann network, feasibility should not be inferred from this register

Reg #

Wastewater Discharge Authorisation Number

Contact us

Have a question for us? Get in contact with our team who can help.